The planned activity “Protection of the territory adjacent to the Hulboaca river against floods. Replacement of the flood controla lake dam”, involves relocation of flood control lake dam upstream on the side of the Balkani road and the discharge of the flood flow through an outlet collector to the point of connection with the existing collector.
The purpose of the works is to restore the original state of the existing resources on the selected territory, development of respective area and avoidance of possible floods, by regulating the water flow at the dam of the reservoir.
The project provides for the construction of the following objects:
- The anti-flood lake dam;
- The spillway in the body of the dam;
- The discharge collector;
- The excavated water reservoir;
- Relocating a section of the rainwater network;
- Diverting the water flows from the high-placed valleys.
The EIM documentation is available here.
The Agreement was issued ny the Enviroment Agency in eraly 2022.